
Repair and Strengthening Methods
Maintenance work is often done around live operations, with tight access and short shutdown windows. Our crews and engineers plan each job around those constraints.
The BridgePro Engineering team are experienced and capable across:
- Concrete repair, including hydro-demolition
- Concrete crack repair injection
- Joint sealing
- Concrete coating
- Concrete cutting including:
- Hydro-demolition
- Wire rope saw
- Floor saws
- Road saws
- Ring saws
- Concrete coring up to 800 mm diameter
- Bridge strengthening: carbon fibre (CFRP) laminates, rods and wraps, bonded stainless steel plates, external post-tensioning and crosshead strengthening
- Deck overlays, deck replacements and deck joint replacement
- Bearing replacement and maintenance
- Anti-carbonation, silane and other protective coatings
BridgePro has undertaken strengthening or rehabilitation works on more than 50 road bridges across Tasmania, including the Pipers River Freight Capacity Upgrade, the Statewide Bridge Strengthening Package 2 and Kanunnah Bridge for the Department of State Growth, and the York Town Rivulet Bridge for West Tamar Council.





