
Project Overview
A $2.04 million construct only strengthening contract for the Department of State Growth.
Stainless steel hanger brackets were fabricated locally in Tasmania and installed with bonded anchors and stainless componentry from beneath the bridge, using BridgePro’s barge to reach the underside over the Leven River. The deck was resurfaced with asphalt removal, a waterproofing spray seal and a new wearing course, with traffic management and message signs keeping the highway moving and materials ordered straight after award to manage long lead times.
Key figures: Locally fabricated stainless steel strengthening, barge access, deck resurfacing.

