Project Overview
With a focus on local industry participation, the Tasmanian Department of State Growth awarded the design and construction of the new bridge to McConnell Dowell, with a commitment to engage local subcontractors throughout the project. BridgePro’s $80 million subcontract ran from October 2022 to 2025.
Our scope covered early constructability input and temporary works design and certification; offsite fabrication of the temporary bridge (200 prestressed decks and about 1,000 tonnes of superstructure steelwork) and its construction over 86 driven piles up to 42 m long, later removed and salvaged; and, on the permanent works, steel pier formwork, 34-tonne precast pile cap elements, pile reinforcing fabrication, all 42 in-situ piers and bored piling for the Black Snake Lane overpass.
The first pier is 12 m tall, holds 100 m³ of concrete and has a 34-tonne reinforcing cage. The piers get taller towards the navigation span, where they reach 15 m, before gradually shortening to 8 m at the Granton end. Each pier was poured as a single pour, with formwork designed by our engineering team to withstand the pressure of the concrete at that height and built by our boilermakers at BridgePro’s Latrobe site. More than 5,000 tonnes of reinforcing cage was fabricated at Latrobe.
Key figures: $80M subcontract, 42 in-situ piers up to 15 m tall, 86 piles 42 m long, 360 m temporary bridge rated for 400-tonne crane operations.
Like all of our projects, the New Bridgewater Bridge serves as a legacy for future generations and a testament to the skilled men and women who contributed to its design and construction.