York Town Rivulet Bridge Strengthening

CFRP shear and kerb strengthening, guard rail upgrades and anti-carbonation coating of the Greens Beach Road Bridge for West Tamar Council.

CFRP strengthening beneath the Greens Beach Road Bridge, York Town Rivulet

Project Overview

Seventy-six carbon fibre laminates, new guard rails and a protective coating on a busy council bridge, with traffic kept moving.

A $399,000 minor works contract for West Tamar Council on the Greens Beach Road Bridge over the York Town Rivulet. The scope covered transverse shear strengthening with 41 CFRP laminates installed over the kerb, longitudinal shear strengthening with 35 laminates along the soffit, kerb strengthening with recesses cut into the soffit and CFRP laid over the other strengthening components, guard rail upgrades with new transitions and end terminals, and an anti-carbonation coating over the soffit and strengthening works.

High traffic volumes called for careful traffic control and a structured communication plan that kept the council and road users informed. Site-specific scaffolding gave access to the hard-to-reach areas beneath the deck, and the concrete was pressure washed and patch repaired before any laminate was placed.

Key figures: $399,000, January to May 2024, 76 CFRP laminates.

Client:
West Tamar Council

Location:
York Town, Tasmania

Contract type:
AS 2906 minor works

Value:
$399,000

Start:
January 2024

Completion:
May 2024

Key personnel:
Matthew Jordan (Operations Manager), John Nel (Project Manager), Frank Jansen (Site Superintendent), Joshua Broomhall (Team Leader)

Related Projects

  • Leven River Bridge Strengthening

    Leven River Bridge Strengthening

    Strengthening of the Leven River Bridge on the Bass Highway at Ulverstone for the Department of State Growth, under the Freight Capacity Upgrade Program.

  • Burnie Berth 4 Early Works

    Burnie Berth 4 Early Works

    Early remediation works at Burnie Berth 4 for TasPorts to stabilise the quay wall and address scour beneath the wharf.

  • Devonport 2 West Tug Berth Pontoon

    Devonport 2 West Tug Berth Pontoon

    Design and construct replacement of a small craft berth that had served the Port of Devonport for nearly 30 years, delivering a new 65 m tug berth and 30 m small craft pontoon for Tasmania’s freight and logistics network.