BridgePro Engineering is a leading Tasmanian contractor specialising in innovative and high-quality end-to-end solutions, from concept to construction.

Statewide Bridge Strengthening Package 2

Repair and strengthening of three Tasmanian bridges for the Department of State Growth using carbon fibre laminates, rods and fabric with stainless steel shear strengthening.

Bridge strengthening works on a Department of State Growth bridge

Project Overview

Three bridges strengthened across the state with carbon fibre and stainless steel, extending their load capacity and service life.

A $1.74 million construct-only package for the Department of State Growth covering the comprehensive repair and strengthening of three bridges. Flexural capacity was increased with carbon fibre laminates, rods and fabric, longitudinal shear with deck dowels and vertical shear with hanger assemblies, all installed while the structures remained in service.

Access was the main challenge: a partially suspended platform was designed so crews could work safely and efficiently beneath each deck, work windows were planned around weather, and Ground Penetrating Radar scanning located existing reinforcement before any coring so the original structure was not damaged.

Key figures: three bridges, $1.74M, 2021 to 2022, CFRP and stainless steel strengthening.

Client:
Department of State Growth

Location:
Statewide, Tasmania

Contract type:
Construct only, AS 2124

Value:
$1.74 million

Start:
2021

Completion:
2022

Key personnel:
Aaron Brimfield (Project Director), Jack van Ek (Operations Manager), John Nel (Project Manager), Joshua Broomhall (Site Supervisor)

Related Projects

  • Pipers River Freight Capacity Upgrade

    Pipers River Freight Capacity Upgrade

    Bridge strengthening for the Department of State Growth using crosshead post-tensioning and CFRP shear strengthening, extending the freight capacity of an existing structure without replacement.

  • Margaret Street Sewer Diversion Project

    Margaret Street Sewer Diversion Project

    A new sewer diversion chamber in Launceston, built by sinking prefabricated segments where open excavation was not possible, improving combined flows to the Margaret Street Pump Station.

  • Davis Street Sewage Pump Station

    Davis Street Sewage Pump Station

    Secant piling, confined-space excavation and concreting for a new underground pump well and overflow storage tank in Smithton, the first CFA secant piling application of its kind in Tasmania.