Project Overview
A $1.5 million design and construct project for TasPorts with a 20-year design life.
BridgePro optimised the provided design to improve amenity and reduce construction risk, replacing about 50 m of sheet pile wall at Fishermans Dock with rock revetment and installing piles that allow a future increase from four to six berths.
Key figures: $1.5M contract value, 4 berths (6 future), 20-year design life.