Projects

White Timber Bridge delivered for Derwent Valley Council

Our team has completed the White Timber Bridge at Lachlan, a design and construct project that links around 850 residents to the rest of the state.

The old bridge was in serious need of refurbishment. Derwent Valley Council engaged BridgePro to design and construct the replacement, which meant supplying and installing a 14 m Double T bridge on site.

Conventional piling could not be used, so BridgePro deployed its specialised Down The Hole Hammer rock drilling gear to install the piles to the required depth.

The project was led by Project Manager Nathan Slater. Congratulations to everyone involved, and thank you to Derwent Valley Council. See the White Timber Bridge project.

All news Media and project enquiries

Keep reading

More from BridgePro

  • What’s new on the BridgePro website

    Company

    5 November 2026

    What’s new on the BridgePro website

    The BridgePro website has been rebuilt around our 2026 capability: a project map, new Engineering & Design, Plant & Equipment, How We Deliver and Sustainability pages, and 24 completed project pages.

  • Inside BridgePro OS: how a START card gets read

    Safety

    5 November 2026

    Inside BridgePro OS: how a START card gets read

    A short walk through the field app, AI-reviewed START cards, SWMS checks and the live dashboards that earned BridgePro OS the 2026 CCF Tasmania Digital Technology Award.

  • 130 piles into dolerite: the Macquarie Point pump station shaft

    Projects

    4 November 2026

    130 piles into dolerite: the Macquarie Point pump station shaft

    Secant piled tank, capping beam and rock excavation for the TasWater Macquarie Point Sewage Pump Station, delivered through the CPB UGL joint venture.

  • Helping the next generation find their start

    Community · People

    27 October 2026

    Helping the next generation find their start

    Carpenters Jacob Lomagno and Max Barton and first-year apprentice Keira Duguid spoke with students about getting started in civil construction at the opening of the CCF Tasmania Earthworks Academy.