White Timber Bridge

Design and construction of a new 14 m Double T bridge at Lachlan for Derwent Valley Council, with piles drilled into rock by our own Down The Hole Hammer gear.

White Timber Bridge, Lachlan, Derwent Valley

Project Overview

A 14 m Double T bridge linking around 850 Lachlan residents to the rest of the state.

The White Timber Bridge in Lachlan, southern Tasmania, links around 850 residents to other areas of the state, and it was in serious need of refurbishment. Derwent Valley Council engaged BridgePro to design and construct the replacement.

The scope was to supply and install a 14 m Double T bridge on site. Ground conditions ruled out conventional piling, so BridgePro deployed its specialised Down The Hole Hammer rock drilling gear to install the piles to the required depth.

The project was led by Project Manager Nathan Slater and completed in April 2024.

Client: Derwent Valley Council

Location: Lachlan, Tasmania

Contract type: Design and construct

Completion: April 2024

Key personnel: Nathan Slater (Project Manager)

Related Projects

  • Forth River Bridge Rectification Works

    Forth River Bridge Rectification Works

    Targeted concrete repairs, epoxy crack injection, deck joint replacement and rock pitching restoration to extend the life of the Forth River Bridge.

  • Devil’s Gate refurbishment

    Devil’s Gate refurbishment

    Repair of erosion in the concrete-lined plunge pool below the Devil’s Gate Dam spillway for Hydro Tasmania, completed in 2017 ahead of the power station refurbishment.

  • UTAS Stadium Redevelopment Piling

    UTAS Stadium Redevelopment Piling

    Design and construct driven steel pile foundations for the UTAS Stadium redevelopment in Launceston, delivered for Fairbrother.