Selfs Point Tankered Waste Facility Piling

CFA piled foundations for the new tankered waste receival facility at Selfs Point, part of TasWater’s sewer transformation upgrades in Hobart.

CFA piling rig at Selfs Point, Hobart

Project Overview

A $546,428 CFA piling package for the TasWater Capital Delivery Office, delivered through the CPB UGL joint venture.

Working within an operating sewage treatment plant, BridgePro installed reinforced continuous flight auger piles to two pile types. Reinforcing cages were prefabricated and checked ahead of installation, a piling working platform was built and tested before rig mobilisation, and independent pile integrity testing was completed on site. Every pile was set out to a BridgePro numbering plan and inspected, with the QA package handed over at completion.

Key figures: CFA piles to two pile types inside an operating treatment plant.

Client:
TasWater Capital Delivery Office, via CPB UGL JV

Contract type:
Construct Only

Value:
$546,428

Start:
March 2026

Completion:
May 2026

Location:
Selfs Point, Hobart

Related Projects

  • Hoggs Bridge

    Hoggs Bridge

    Replacement of a Hoggs Bridge span badly damaged in the June 2016 flood, restoring the Railton community's link across the Mersey River to the Bass Highway.

  • Macquarie Wharf 6 RSV Nuyina Berthing Upgrades

    Macquarie Wharf 6 RSV Nuyina Berthing Upgrades

    New berthing infrastructure at Macquarie Wharf 6 in Hobart to accommodate the Antarctic icebreaker RSV Nuyina, including fender blocks, bollards and wharf concrete repairs.

  • Northern Geotechnical Drilling Campaign

    Northern Geotechnical Drilling Campaign

    BridgePro's jack-up barge provided a stable over-water platform for TasPorts' geotechnical drilling campaign at the Ports of Burnie and Stanley.