Project Overview
A $546,428 CFA piling package for the TasWater Capital Delivery Office, delivered through the CPB UGL joint venture.
Working within an operating sewage treatment plant, BridgePro installed reinforced continuous flight auger piles to two pile types. Reinforcing cages were prefabricated and checked ahead of installation, a piling working platform was built and tested before rig mobilisation, and independent pile integrity testing was completed on site. Every pile was set out to a BridgePro numbering plan and inspected, with the QA package handed over at completion.
Key figures: CFA piles to two pile types inside an operating treatment plant.