Port Latta fender replacement delivered in 47 days, 1.8 km offshore

Replacing 55-year-old fender infrastructure on an open-water dolphin at Port Latta, with the port fully operational throughout.

Grange Resources’ Port Latta terminal ships iron ore pellets from Tasmania’s north-west coast, and its berthing dolphins sit 1.8 kilometres from shore in open tidal water. BridgePro replaced the original fenders with a Trelleborg Super Cone system, working from a bespoke 36 m-leg jack-up barge with a 55-tonne crane.

About 22 cubic metres of concrete was delivered by helicopter in 76 lifts. The works were completed in 47 days with zero injuries, zero environmental incidents and zero rework.

“The works were completed to a very high standard and with an excellent safety performance. Grange Resources is extremely pleased with the outcome of this project and the professionalism shown by BridgePro Engineering.”

Grange Resources

The project won the 2026 CCF Tasmania Earth Award for projects up to $2 million. Read the project page.

Keep reading

More from BridgePro

  • What’s new on the BridgePro website

    Company

    5 November 2026

    What’s new on the BridgePro website

    The BridgePro website has been rebuilt around our 2026 capability: a project map, new Engineering & Design, Plant & Equipment, How We Deliver and Sustainability pages, and 24 completed project pages.

  • Inside BridgePro OS: how a START card gets read

    Safety

    5 November 2026

    Inside BridgePro OS: how a START card gets read

    A short walk through the field app, AI-reviewed START cards, SWMS checks and the live dashboards that earned BridgePro OS the 2026 CCF Tasmania Digital Technology Award.

  • 130 piles into dolerite: the Macquarie Point pump station shaft

    Projects

    4 November 2026

    130 piles into dolerite: the Macquarie Point pump station shaft

    Secant piled tank, capping beam and rock excavation for the TasWater Macquarie Point Sewage Pump Station, delivered through the CPB UGL joint venture.

  • Helping the next generation find their start

    Community · People

    27 October 2026

    Helping the next generation find their start

    Carpenters Jacob Lomagno and Max Barton and first-year apprentice Keira Duguid spoke with students about getting started in civil construction at the opening of the CCF Tasmania Earthworks Academy.