BridgePro has completed strengthening works on the Leven River Bridge on the Bass Highway at Ulverstone for the Department of State Growth, as part of the Freight Capacity Upgrade Program.

Stainless steel hanger brackets were fabricated locally in Tasmania and installed to the bridge superstructure with bonded anchors. To reach the underside of the bridge, the team worked from BridgePro’s marine plant on the Leven River, planning the works around river flows and outside peak traffic periods.

Stainless steel has a long lead time, so materials were ordered straight after award and fabricated ahead of the site works. On the deck, the crew removed the old asphalt, applied a waterproofing spray seal and laid a new asphalt wearing course, with message signs and traffic management keeping highway traffic moving.

The works ran from August 2025 to October 2026. Read the project page.

Keep reading

More from BridgePro

  • What’s new on the BridgePro website

    Company

    5 November 2026

    What’s new on the BridgePro website

    The BridgePro website has been rebuilt around our 2026 capability: a project map, new Engineering & Design, Plant & Equipment, How We Deliver and Sustainability pages, and 24 completed project pages.

  • Inside BridgePro OS: how a START card gets read

    Safety

    5 November 2026

    Inside BridgePro OS: how a START card gets read

    A short walk through the field app, AI-reviewed START cards, SWMS checks and the live dashboards that earned BridgePro OS the 2026 CCF Tasmania Digital Technology Award.

  • 130 piles into dolerite: the Macquarie Point pump station shaft

    Projects

    4 November 2026

    130 piles into dolerite: the Macquarie Point pump station shaft

    Secant piled tank, capping beam and rock excavation for the TasWater Macquarie Point Sewage Pump Station, delivered through the CPB UGL joint venture.

  • Helping the next generation find their start

    Community · People

    27 October 2026

    Helping the next generation find their start

    Carpenters Jacob Lomagno and Max Barton and first-year apprentice Keira Duguid spoke with students about getting started in civil construction at the opening of the CCF Tasmania Earthworks Academy.