Community

A new base for the Teddy Sheean VC statue

BridgePro designed and installed the base for Latrobe’s new Teddy Sheean VC statue, in place for Remembrance Day.

Teddy Sheean VC statue in Latrobe on the base designed and installed by BridgePro
The Teddy Sheean VC statue in Latrobe, on its BridgePro base.

The statue was unveiled at Latrobe’s Remembrance Day service on 11 November 2024. It was a privilege for our team to play a part in honouring Teddy Sheean in the town where BridgePro began.

All news Media and project enquiries

Keep reading

More from BridgePro

  • What’s new on the BridgePro website

    Company

    5 November 2026

    What’s new on the BridgePro website

    The BridgePro website has been rebuilt around our 2026 capability: a project map, new Engineering & Design, Plant & Equipment, How We Deliver and Sustainability pages, and 24 completed project pages.

  • Inside BridgePro OS: how a START card gets read

    Safety

    5 November 2026

    Inside BridgePro OS: how a START card gets read

    A short walk through the field app, AI-reviewed START cards, SWMS checks and the live dashboards that earned BridgePro OS the 2026 CCF Tasmania Digital Technology Award.

  • 130 piles into dolerite: the Macquarie Point pump station shaft

    Projects

    4 November 2026

    130 piles into dolerite: the Macquarie Point pump station shaft

    Secant piled tank, capping beam and rock excavation for the TasWater Macquarie Point Sewage Pump Station, delivered through the CPB UGL joint venture.

  • Helping the next generation find their start

    Community · People

    27 October 2026

    Helping the next generation find their start

    Carpenters Jacob Lomagno and Max Barton and first-year apprentice Keira Duguid spoke with students about getting started in civil construction at the opening of the CCF Tasmania Earthworks Academy.