Project Overview
Foundation piling for a new clarifier at the Ulverstone Sewage Treatment Plant, part of an upgrade to increase the plant’s wastewater treatment capacity.
BridgePro drilled and installed 24 bored piles, from approximately 2 to 6 m deep, with 24 custom reinforcement cages tailored to each pile, and poured the piles to the nominated levels.
A specialised bored piling rig handled the varying ground conditions, and a bespoke dewatering system managed the high water table to keep the work area dry.
Key figures: 24 bored piles, 2 to 6 m deep, with custom reinforcement cages.