Toll Burnie Infrastructure Upgrades McGaw Wharf

Four new offshore mooring and berthing dolphins, two new dolphins for an upgraded stern loading ramp, and stern abutment upgrades at McGaw Wharf, Burnie.

Toll Burnie Infrastructure Upgrades McGaw Wharf

A $10 million project for Toll and McConnell Dowell under AS 4902, August 2018 to March 2019.

BridgePro’s in-house rock socket drilling system and temporary works design allowed 18 raked piles to be driven over water using pile driving frames, piling into rock to 30 m below sea level. Piles were concreted 100 m offshore on night shifts around daily Toll berthings.

Key figures: $10M, 6 dolphins, 18 raked piles, rock sockets 30 m below sea level.

Client:
Toll / McConnell Dowell

Contract type:
AS 4902

Value:
$10 million

Start:
August 2018

Completion:
March 2019

More projects

  • Rosebery Mine Bridges

    Rosebery Mine Bridges

    BridgePro Engineering was engaged by MMG Australia Limited to design and fabricate 2No. steel bridges in accordance with AS 5100. One 40 and one 30m, both single spans over Stitt River and Rosebery Creek, respectively. These bridges are to carry a tailing pipeline from the mine site to a new tailings storage facility at Rosebery

  • Northbank to Seaport Pedestrian Bridge

    Northbank to Seaport Pedestrian Bridge

    The design team at BridgePro worked tirelessly to develop a functional and visually appealing bridge, with a proven world-leading design solution. The design and construction of such a unique solution required a departure from conventional tried-and-tested designs.

  • St Leonards Data Centre Piling

    St Leonards Data Centre Piling

    Bored piling for a data centre development in Launceston, with multiple Soilmec rigs mobilised and night-shift piling to accelerate the programme.