BridgePro Engineering is a leading Tasmanian contractor specialising in innovative and high-quality end-to-end solutions, from concept to construction.

Davis Street Sewage Pump Station

Secant piling, confined-space excavation and concreting for a new underground pump well and overflow storage tank in Smithton, the first CFA secant piling application of its kind in Tasmania.

Project Overview

A $5.4 million lump sum package for TasWater’s Capital Delivery Office, delivered through the CPB UGL joint venture.

The works comprised 84 intersecting secant piles (42 soft and 42 hard, alternating) of 750 mm diameter, 13.25 m deep and socketed 7 m into siltstone, installed by CFA method using a Soilmec SR75 rig. This was followed by ring beam construction, confined-space excavation, base plug pour, bottom and intermediate slabs, HDPE-lined perimeter formwork, dividing walls, inlet and outlet connections and the top lid with access hatches.

Key figures: $5.4M contract value, 84 secant piles, 750 mm diameter, 13.25 m deep.

Client:
TasWater Capital Delivery Office, via CPB UGL JV

Location:
Smithton, Tasmania

Contract type:
Bespoke lump sum, via CPB UGL JV

Value:
$5.4 million

Start:
January 2024

Completion:
April 2025

Related Projects

  • White Timber Bridge

    White Timber Bridge

    Design and construction of a 14 m Double T bridge at Lachlan for Derwent Valley Council, with piles drilled into rock using our Down The Hole Hammer gear. Completed April 2024.

  • Port Latta Dolphin Fender Replacement

    Port Latta Dolphin Fender Replacement

    Replacement of 55-year-old fender infrastructure 1.8 kilometres offshore in open tidal waters for Grange Resources, including a helicopter-assisted concrete delivery operation.

  • 17 Acre Creek Bridge Replacement

    17 Acre Creek Bridge Replacement

    Design and construct replacement of Bridge No. 51 over 17 Acre Creek on Wielangta Road for Glamorgan Spring Bay Council, with a slender single span built to handle flood flows.