Spirit of Tasmania Terminal Buildings Piling

Design and installation of foundation piles for the terminal and ancillary buildings at the new TT-Line Spirit of Tasmania facility in East Devonport, for Vos Construction.

Foundation piling for the Spirit of Tasmania terminal buildings, East Devonport

Project Overview

Foundation piling for six terminal and ancillary buildings, delivered for Vos Construction.

BridgePro designed the piles and pile cap connections and used three pile types to suit the loads and ground at each building. Driven steel CHS piles were installed with a 24 to 35 t excavator and vibratory and impact hammers, helical screw piles were manufactured in-house and installed with a pendulum auger, and 450 mm cased bored piles with prefabricated cages were installed for Building 8. PDA testing, pile set and torque records verified capacity, and the works were delivered in a single mobilisation.

Key figures: Driven, screw and bored piles across six buildings.

Client:
Vos Construction

Contract type:
Construct only, including pile design

Value:
$536,900

Start:
September 2025

Completion:
June 2026

Location:
East Devonport, Tasmania

Related Projects

  • Port Latta Dolphin Fender Replacement

    Port Latta Dolphin Fender Replacement

    Replacement of 55-year-old fender infrastructure 1.8 kilometres offshore in open tidal waters for Grange Resources, including a helicopter-assisted concrete delivery operation.

  • The New Bridgewater Bridge

    The New Bridgewater Bridge

    Key subcontractor to McConnell Dowell on Tasmania's largest transport infrastructure project: all 42 in-situ piers, a 360 m temporary bridge on 86 piles and more than 5,000 tonnes of reinforcing cage.

  • Bridgewater Bridge Temporary Bridge Demolition

    Bridgewater Bridge Temporary Bridge Demolition

    Demolition of the temporary bridge built for the New Bridgewater Bridge project, including underwater pile extraction in the River Derwent and re-use of all steel bridge components.