Spirit of Tasmania Terminal 3 Fixed Shore Ramp

A five-span, four-lane fixed shore ramp for the new Spirit of Tasmania terminal in Devonport, constructed as a major subcontractor to BMD.

Project Overview

A $23 million subcontract over 18 months on site, with up to 90 staff.

The fixed shore ramp is a tightly curved and steeply graded structure with split grades across the deck. BridgePro worked with BMD and TT-Line to optimise the design, saving time and cost on a critical element of the project.

The works comprised 100 bored piles of 8 to 15 m socketed into hard rock and installed with a 25 m drilling rig, post-tensioned crossheads and Super T girders.

Key figures: $23M subcontract, 5 spans, 100 piles.

Client:
BMD / TT-Line

Status:
Completed; vessel berthing from August 2026

Location:
Port of Devonport

Value:
$23 million subcontract

Related Projects

  • White Timber Bridge

    White Timber Bridge

    Design and construction of a 14 m Double T bridge at Lachlan for Derwent Valley Council, with piles drilled into rock using our Down The Hole Hammer gear. Completed April 2024.

  • Bridge Strengthening Programme 2017 to 2020

    Bridge Strengthening Programme 2017 to 2020

    A multi-year programme of individual bridge strengthening contracts for the Department of State Growth, spanning CFRP laminate and NSM rod strengthening, stainless steel dowel connections and composite precast deck replacement.

  • Mersey Forest Road Bridges

    Mersey Forest Road Bridges

    New bridges on Mersey Forest Road for Sustainable Timber Tasmania, built with a BridgePro precast bridge system developed for hard-to-reach sites. Completed June 2023.