Devonport 2 West Tug Berth Pontoon

Design and construct replacement of a small craft berth that had served the Port of Devonport for nearly 30 years, delivering a new 65 m tug berth and 30 m small craft pontoon for Tasmania’s freight and logistics network.

Project Overview

A $2.26 million (ex GST) design and construct project for TasPorts, delivering safe, all-tide berthing for tugs, pilot boats and marine crews.

The scope included demolition of the existing berth, a 55 m rock revetment using 1,400 tonnes of rock, a new 65 m tug berth pontoon and a 30 m small craft pontoon, with all steel components fabricated in-house at Latrobe.

Varying ground including basalt was addressed by fabricating a custom down-the-hole hammer to achieve pile accuracy and stability, with 35 m ground anchor tiebacks and a kick-up gangway designed for 3.5 m tides.

The project was named a joint winner of the 2025 Civil Contractors Federation Tasmania Earth Award (Excellence in Civil Construction, $2M to $5M category).

Key figures: $2.26M contract value (ex GST), 65 m tug berth, 30 m small craft berth, 2025 CCF Earth Award.

Client:
TasPorts

Contract type:
Design and Construct

Value:
$2.26 million (ex GST)

Start:
April 2024

Completion:
September 2024

Award:
2025 CCF Tasmania Earth Award (joint winner)

Related Projects

  • York Town Rivulet Bridge Strengthening

    York Town Rivulet Bridge Strengthening

    CFRP shear and kerb strengthening, guard rail upgrades and anti-carbonation coating of the Greens Beach Road Bridge for West Tamar Council.

  • Macquarie Wharf 6 RSV Nuyina Berthing Upgrades

    Macquarie Wharf 6 RSV Nuyina Berthing Upgrades

    New berthing infrastructure at Macquarie Wharf 6 in Hobart to accommodate the Antarctic icebreaker RSV Nuyina, including fender blocks, bollards and wharf concrete repairs.

  • Togari Bridge, Montagu

    Togari Bridge, Montagu

    Replacement of a remote single-span bridge near Smithton with a 16 m long, 10.9 m wide structure on 4.5 m high cast in-situ concrete abutments.