UTAS Forestry and Timber Yards Building Bored Piers

Bored pier foundations for the UTAS Forestry and Timber Yards Building in central Hobart, delivered for Hansen Yuncken.

Bored piling rig at the UTAS Forestry Building site, Hobart

Project Overview

A $321,300 piling package for Hansen Yuncken on a confined inner-city site.

The package included the bored piles for the building’s pedestrian bridge, drilled into bedrock with a down-the-hole hammer beside a newly installed 1350 mm stormwater pipe and extended below its invert to the designer’s revised depths. BridgePro raised the risk from the adjacent backfilled trench early and planned casing and backfill measures for the affected piles, working with compact rigs between existing buildings.

Key figures: 900 mm bored piers drilled into bedrock.

Client:
Hansen Yuncken

Contract type:
Construct Only

Value:
$321,300

Start:
November 2024

Completion:
May 2025

Location:
Melville Street, Hobart

Related Projects

  • Devonport Berth 2 East AMU Installation

    Devonport Berth 2 East AMU Installation

    Crane rail beam strengthening, reinforced concrete foundations and installation of two automated mooring units at Devonport Berth 2 East.

  • Devonport 2 West Tug Berth Pontoon

    Devonport 2 West Tug Berth Pontoon

    Design and construct replacement of a small craft berth that had served the Port of Devonport for nearly 30 years, delivering a new 65 m tug berth and 30 m small craft pontoon for Tasmania’s freight and logistics network.

  • UTAS Forestry and Timber Yards Building Bored Piers

    UTAS Forestry and Timber Yards Building Bored Piers

    Bored pier foundations for the UTAS Forestry and Timber Yards Building in central Hobart, delivered for Hansen Yuncken.