Foundation Construction

As every builder knows, the success of a project begins with the foundations.

This is true for bridge construction too, but also equally true for a range of other projects. Foundation construction is another core area for BridgePro Engineering.

Rock solid foundations

When it comes to constructing a bridge that stands the test of time, the foundations must be rock solid.

Our experience in bridge and marine design and construction has enabled us to develop a specialist skill set, which means our foundation piling is second to none.

We are able to provide:
  • Bored piles up to 1800 dia using our Soilmex SR-75 (70t) ir Entco (40t) rotary drilling rigs
  • Bored piles in hard rock using DTH to 1500 dia
  • Continuous Flight Auger (CFA) piles in 450 and 600 dia
  • Driven steel, concrete, or timber piles using our range of piling hammers from 15kJ through to our Junttan HHx210 with 210kJ
  • Steel screw piles up to 900kN
  • Sheet piles installed through vibration by excavator or crane suspended hammer
  • Ground anchors drilled using an excavator mounted drifter (50 to 127 dia) and DTH (150 to 305 dia)

Along with our specialist piling equipment, we have a range of excavators (8t to 45t) and crawler cranes (50t to 275t) ready for your next project!

Stay up to date with our social media...

Follow us on Facebook

June 04, 2024

Lots of BridgePro bridge building goodness in here. Pleased to be working with McConnell Dowel to deliver this bridge.

June 04, 2024

A great little video showing how a bridge like the Mersey River bridge works and some of the work recently undertaken by BridgePro to move it back into position and lock it off. Thank you to everyone for their patience...

May 31, 2024

May 15, 2024

May 14, 2024

At Bridgepro we do more than build new bridges. Sometimes we work hard to ensure bridges continue to perform as intended for many more years. This is one such case where we will reposition/ re-centre this significant bridge over the...

May 13, 2024

Are you looking for a career that leaves a legacy? BridgePro Engineering is seeking an experienced Accounts Payable Officer to join our team at our HQ in Latrobe, Tasmania. We are a team who genuinely care for the work we...

May 08, 2024

Let us take you back to a previous project of ours, the Northbank to Seaport Boulevard Pedestrian Bridge. Our dedicated team at BridgePro put in immense effort to create a functional and visually stunning bridge, incorporating a world-leading design solution...

May 08, 2024

BridgePro are pleased to have been able to deliver Stage 1 and Stage 2 of the strengthening works on the Kununnah Bridge over the Arthur river. The works required the development of some specialised access which was able to be...

April 30, 2024

As we continue to invest in our future projects and generations at Bridge Pro Engineering, we would like to introduce to you our brand new Soilmec SR-75 Blue Tec CFA (continuous flight auger piles). Designed for all foundation techniques with...

April 24, 2024

Our team recently completed the White Timber Bridge project in Lachlan, southern Tasmania. This bridge plays a vital role in linking the ~850 residents to other areas of the state, and it was in serious need of refurbishment. Derwent Valley...
Aboriginal flag Torres strait islander flag
BridgePro acknowledges the traditional owners of this island, and pays respects to all Tasmanian Aboriginal people past, present and future.