Dam erosion repairs
In 2016, divers and sonar scanning identified some significant erosion of the concrete-lined plunge pool below the spillway of Devils Gate Dam, which is submerged all year round. The repair is one of the most critical events to be done as the Devil's Gate Power Station is due to a major refurbishment in 2018.
The erosion was properly exposed in March 2017 when the plunge pool was drained for the 1st time since the diversion tunnel closure in 1969. Once the damage had been fully assessed, a fast-paced programme of rectification works commenced, which consisted of high-strength reinforced concrete overlays over the whole area of damage. The repair methodology was developed and implemented BridgePro Engineering team.